Securing a Fire NOC for dining outlets in Mumbai (MCGM) involves:
• Kitchen Safety: Installing dry chemical / CO2 cylinders, gas leak detectors, gas shut-off valves, and commercial exhaust hood fire suppression systems.
• Exit Paths: At least two exits if occupancy exceeds 50. Paths must be free of storage.
• Provisional NOC: Yes, apply for a Provisional Fire NOC with architectural drawings showing kitchen locations, seating, and exits before building. After construction, call for final inspection to obtain the Final NOC.